• Jobs & Careers/
  • Contact/
  • News & Blog
Open Search...
Logo
Jobs & CareersContactNews & Blog
Close Icon
Our Solutions
Systems and Brands
Case Studies
Magazine
Service Portal
ACADEMY
About us
Logo
Our Solutions
Systems and Brands
Case Studies
Magazine
Service Portal
ACADEMY
About us
Home

Overview

Kingsway Hove is a landmark eight storey residential development on Hove seafront creating 58 luxury apartments.


The project has transformed the former Texaco Garage site into a desirable living accommodation complete with sea views and a conveniently located retail unit at ground floor level. The green roofs create a visual living space in this otherwise space-restricted area of the city.

HERTALAN Easy Cover 1.5mm EPDM membrane was installed to waterproof the flat roofs at various levels of the building, with a total area coverage of approximately 1500 M². HERTALAN was chosen by the project’s main/roofing contractor L R Lima Construction, as it provides an easy to install and cost-effective waterproofing solution. The contractor opted to use HERTALAN made to measure sheets, which were supplied prefabricated to the exact dimensions. This ensured that the membranes were quick to install and reduced the number of seams and joints within the waterproofing layer.  In addition, CARLISLE CM also supplied a suitable (extensive) green roof design which requires limited ongoing maintenance and suitable for a coastal location. HERTALAN EPDM membranes are 100% root retardant and long service life which makes them ideal for all kinds of green roof systems.


(Project illustrations by LCE Architects)

CCM Logo
CARLISLE® Construction Materials Ltd.

Lancaster House, Millenium Business Park
Mansfield, Notts NG19 7DW
T +44 1623 627 285
E info.uk@ccm-europe.com

  • LinkedIn
  • Facebook
  • YouTube
© 2026 CCM Europe
Our Solutions
  • EPDM Membranes
  • TPO/FPO Membranes
  • Liquid Waterproofing
  • Facade Systems
  • Sealing & Bonding
Products
  • RESITRIX®
  • HERTALAN®
  • SURE WELD®
  • ALUTRIX®
  • ARBOFLEX®
  • ARBO®
Service
  • Downloads
  • Technical videos
  • Search
  • Contact
  • Stockists
About CARLISLE® CM Europe
  • About Us
  • Contact
  • Jobs & Careers
  • CARLISLE USA
Legal
  • Data Protection
  • Terms & Conditions

QUICK FACTS

  • Project: Kingsway Hove (Residential Apartments)

  • Client: Rocco Homes

  • Architect: LCE Architecture

  • Roofing Contractor: L R Lima


Material:

  • Waterproofing membrane: HERTALAN® Easy Cover

  • CCM Insulation

  • Green Roof System