Schiphol Rijk heeft er een nieuwe vrachtloods bij. Het 61.000 m2 grote gebouw met de naam Vrachtloods 17 staat op een locatie direct aan de Kaagbaan en wordt omschreven als één van de grootste en meest geavanceerde logistieke gebouwen op een luchthaven ter wereld. De enorme hal met 6.700 m2 inpandige kantoorruimte is met name bijzonder omdat het volledig demontabel is en voor meer dan 50% bestaat uit hergebruikte materialen.

On the roof of this BREEAM Excellent-certified building, another beautiful thing arose. The largest continuous HERTALAN® EASY COVER (FR) roof in the Netherlands. Constructed in total with membranes with a thickness of 1.5 mm and a size of 5.60 x 30 m. The method of fastening is extremely durable and has gone via Carlisle® Induction Technology.

Down to the last detail

Freight building 17 is such a large project that the production of EPDM and fasteners is geared to it. Close cooperation with the producer of the fasteners (SFS) was necessary because such a project has to be done right the first time. This is also the reason why we are present at these types of projects, both in the preliminary phase and during the execution.

Security of supply is essential, for which an extra internal storage was created at both production locations. This way we could even deliver earlier if material was needed earlier. Processing was also optimized. In the preparation, a laying plan was drawn up together with the roofer Hollanddak, so that with a limited staffing, 168 m2 EPDM membrane could be laid in no time at all and mechanically fastened by means of induction.

Image

Completely attuned to each other

There are four rolls of 168 m2 each on a pallet, so it is important that the rolls are positioned correctly in advance during delivery. The train worked perfectly in any case: one group attaches the insulation with the screw-groove-pressure distribution plate combination, then the second team lay the HERTALAN® membrane, the third group gets to work with the CARLISLE® Induction System, which uses the electromagnetic induction technology. And the first team can already move on to the next level. No one has to wait for anyone else. In this way, the team laid 3,500 to 4,000 m2 per week. The time savings were of course already made in the work preparation and the prefabricated delivery.  

Image
Image
Image
Image
Image
Image

Project Details

Project

Freight shed 17, Schiphol

Architect

DP6 Architects

Contractor

De Vries en Verburg

Client

Schiphol Real Estate

Roofer

Hollanddak

MATERIAAL

HERTALAN® EASY COVER FR