The Project
The Boulevard development demanded high-quality joint sealing and membrane performance across extensive façade works. Given the project’s scale and accelerated schedule, on-site efficiency was critical. EPAM was selected for its proven simplicity and dependable adhesion, especially under variable temperatures typical of a UK build environment.
Early site conditions included cold weather that could have hindered productivity, but EPAM’s ability to perform without the need for primers, even in low temperatures, ensured the installation stayed on track. Its versatility provided a consistent, high-performance seal between the concrete and sheathing board interfaces, supporting the project’s goals for air and water tightness.
Rite-Fix played an instrumental role in introducing ARBOSHIELD PRO®’s EPAM to the project, recognising its fit for the technical and scheduling demands of the build. Backed by CARLISLE®’s quick technical response and supply turnaround, materials were delivered promptly to site, ensuring no disruption to the programme.
The Boulevard continues to progress on schedule, with EPAM delivering consistent results across both the 15-storey and 5-storey blocks - a reflection of the product’s versatility and ARBO’s commitment to dependable, responsive support for major construction projects.